Victoria University, St Albans - Under construction Due for completion in 2012, the new facility will be development over 11months and comprise 2 phases. The facility will also encompass a 300 m2 gym, chnage room facilities, storeroom, program room, a recreation entry and reception area. Administration offices and a health science wing will complete the expanded offering of the university. Project value $700k + |
![]() |
140 Bourke St, Melbourne CBD - Under construction Prolux Electrical nominated electrical contractor to assist a commercial builder to striped the entire building and start again. Level by level, Prolux worked in a tight time frame to have each level completety re-wired and re-furbished back to base building works. Over 3000 fluorscent lights & 500kms of lighting cable and 36 main switchboards were installed within 8 months over 2 stages. |
![]() |
32 Grange Road, Toorak - Under construction Hemmingway Luxury Residences designed and crafted with absolute perfection. Nothing here has been missed. Solid brass switchboards, full dynalite automation, stainless steel wall boxes contain every wall socket. 5 penthouse style residences in one of Melbourne's most exclusive streets. |
![]() |
Victoria University, Footscray - 10months Completed on time and within budget in October 2011, Prolux Electrical's biggest project to date. Total contract value over $1.1M in electrical. Works included a new learning commons, student lounge, cafeteria, staff rooms, auditorium and lecture theatre. Full C-bus lighting control and automation. |
![]() |
663 Toorak Rd, Toorak |
![]() |
Britex, Chapman St Blackburn Britex and Rug Doctor Australia relocated office and warehouse facilities to the existing Rockwell automation complex in Chapman St Blackburn. Prolux Electrical nominated, electrical contractor for Britex Australia, successfully reloated all power, phone and date with minimal down time to business. Works included all structured cabling, voice over fibre, power, lighting and UPS set up. |
![]() |
Precon Living Wire up & fit off mobile homes in preparation for transport to permanent locations. Nominated electrican, will then connect house to supply. |
![]() |
Giorgio Armani, Melbourne wide - Service Contractor Prolux Electrical Contractors preferred service contractor for Emporio and Giorgio Armani outlets Melbourne wide. |
![]() |
Yd Clothing, Knox City Shopping Centre Demolishion of existing shop, supply and installation of new lighting, power and services to counter |
![]() |
Pepe Jeans, Melbourne Pepe Jeans London are currently setting up their Melbourne based stores using Prolux Electrical as their preferred electrical contractor. The first new store at Westfield Doncaster took 5 weeks. |
![]() |
Glue Store, Geelong Complete fit-out through Asiana Projects. Custom suspended lighting, power services and illuminated displays. Prolux Electrical worked within a very tight time-frame, turning an empty shell to a trading store within three weeks |
![]() |
Saba, Chapel St, Melbourne Saba, which provide premium men's and women's clothing, opened a new shop in Chapel St, Sth Yarra. Under tight time-restraints, Prolux Electrical transformed an existing empty shell into the exquisite shop we now see. |
![]() |
Husk, Lygon St - 4 weeks Husk, providers of corporate wear, gifts, homewares and sensory care opened a new shop in Lygon st, Carlton. Prolux Electrical performed all electricall installations at this site. Custom light-fittings and changeliers help this site really stand out from the rest. A true test of patience as we spent many hours ensuring everything was just as the lighting designers had specified. |
![]() |
Get Fresh, Vermont South The old Dan Murphy's in Vermont South was stripped out the converted into a Get Fresh Supermarket. Prolux Electrical wired the control and supply all the suppermarket cool rooms, including the Dairy, Produce and Meat department's refrigeration cases. A new custom- built 500A mechanical services switchboard was installed for refrigeration supply. |
![]() |
Koko Black, Various Locations Coburg Factory: Production line machine wiring and control. Royal Arcade Melbourne: Service sector. 167 Lygon St Carlton. Chadstone Shopping Centre, 52 Collions St Melbourne: Complete shop fit-out. |
![]() |
ACS Mitcham Office - 5months An office and warehouse data and electrical fit-out. When the ACS group took over the old NAB eastern headquarters, they used Prolux Electrical to strip-out and re-furbish the 6,200sq metre complex to suit their requirements. More than 14,600 metres of CAT5e cabling was installed. |
![]() |
Bromham Pl Warehouse Development - 7months Nineteen warehouses built from scratch in Richmond with Prolux Electrical as the nominated electrical contractor. Works included each warehouse fit-out, underground cabling, substation works, temporary construction power, mains control and telecommunications infrastructure. |
![]() |
North Blackburn Shopping Centre Carpark lighting upgrade and main switchboard relocation. Switchboard carefully relocated after-hours to prevent shopping centre down time. Temporary generator supply arranged and connected between shifts. |
![]() |
SBA Bayswater - 3 Days Production area lighting upgrade. Suspended fluorescent lighting was removed from their factory and 58 Hi-bay lights were installed. Prolux Electrical worked in careful conjunction with SBA management so as to upgrade the lighting without interruption to production. |
![]() |
BMS, Kew - 4weeks Prolux Electrical wired and installed 140 data and phone outlets to new call-stations. The job included the supply and installation of a new data cabinet, all server equipment, PABX system and patch panels.
|
![]() |
Student Accommodation - 12months This state-of-the-art, 5 storey student accommodation complex in Nth Melbourne was put together in 2008. Fourteen rooms per level, with communal kitchen and laundry facilities to the ground floor level. Prolux Electrical oversaw the installation of data, broadband and FTA TV to each room, as well as automated lighting, swipe-card access and keyless entry systems.
|
![]() |
Rapid Tune Service Centre, Ferntree Gully Office and workshop fit out. External signage lighting
|
![]() |
Stramit Bayswater Division - 5weeks Production warehouse lighting upgrade. Prolux Electrical removed more than 300 Hi-bay light fittings and replaced them with more energy efficient low-bay fittings. Lumen levels increased by 36% and power consumption decreased by 6.8% |
![]() |
Mt Buller Central, Mt Buller New LED back-lit illumiated signage installations |
![]() |
St Catherine's Primary School, Berwick New year 7 centre under development, completion due August 2009. Prolux Electrical wiring all electrical, PA system, data and telephony. Works to include underground cable reticulation of electrical supply to existing buildings |
![]() |
Crystal Jade - 6 weeks Fine chinese cuisine located on the corner of Little Bourke and Elizabeth St CBD, opened 22nd December 2008. With electrical works commencing mid-November, we had all hands on deck to complete the restaurant's electrical requirements within a very tight time-frame at the busiest time of the year. |
![]() |
Jamie Oliver's Restaurant - 6months 103 Flinders Lane, composing of the Cherry Bar, Jamie Oliver's Kitchen and offices. Prolux Electrical re-wired and fit-out following severe fire in 2008. |
![]() |
Bayswater Supermarket Rebuild - 20weeks Late in 2007, St Vinnies and NQR at 700 Mountain hwy Bayswater experience a devasting fire. Prolux Electrical re-furbished the establishment including a new 3kva substation, Ct metering, switchboards, incoming mains, carpark lighting and complete internal fit-out. |